1. An electrical line diagram shall be completed for generation set that utilizes DC power.
2. In the case of an electrical work or a modification with a main cable that is rated 70 amperes or higher shall be certified by a professional electrical engineer registered under the Professional Engineers Registration Act and approve by an inspector before commencement of the electrical work or the modification.
3. An electrical work or modification with a main cable rated below 70 amperes, shall be certified by an electrical engineer registered under the Professional Engineers Registration Act, or a registered electrician, before commencement of the electrical work or modification.
certified by an electrical engineer registered under the Professional Engineers Registration Act; or
a registered electrician.
2.Notification of Completion of Electrical Work
Upon completing any electrical work or modification, an electrician shall :
within forty-eight hours, provide to the owner a copy of the work completion certificate stating that the electrical work or modification is satisfactory, complies with the Specification, and is safe from electrical hazard;
input into the automated system within forty-eight hours of the completion of the electrical work or modification, the particulars of the electrical work, the work completion certificate and a notification that includes -
the Global Positioning Satellite coordinates of the premises;
the name of the owner;
the electrical line diagram or the electrical design detailing the electrical work or the modification, as the case may be; and
where available, the civic address, valuation number, volume number and folio number of the premises